DSR PUNE 2012-13 PDF

1GENERAL NOTES Schedule of Rates is prepared for the year Operative from 1st Oct. and is applicable for P.W. Circle. Pune. This annual Progress Report for the year includes the important programmes and .. These are located in Mumbai (41), Thane (9) and Pune (38) district. These functioning .. DIC, Kolhapur DSR yet to be submitted. Dsr Pwd. Mumbai. Jun 19, -. PWD MAHARASHTRA. DSR. 17 Pune PWD DSR |. Deep dsr pune 13 pdf – dsr.

Author: Mautaur Mausho
Country: Bolivia
Language: English (Spanish)
Genre: Music
Published (Last): 9 September 2013
Pages: 46
PDF File Size: 2.72 Mb
ePub File Size: 9.57 Mb
ISBN: 598-1-13265-507-6
Downloads: 3728
Price: Free* [*Free Regsitration Required]
Uploader: Akizilkree

Resolution Planning Department No. Sugarcane factory area 10 Km. 201-213 High Tensile Steel Rs. Pwd dsr pune 13 pdf – dsr pune 13 pdf Rate of heating and unloading is Rs.

The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G.

R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc. If such documentary evidence is not produced the component of Royalty charges as contemplated in the item shall not be paid to Dzr. D Structural Steel Rs. The floor to floor height of 4.

C Tor Steel H. For supply items and providing Earth work in embankment of road materials lead is not considered in the rate analysis. Pipes, Pre stressed concrete pipes, A. R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc.

  DATTATREYA STOTRAM TELUGU PDF

For following items of Bridge works the separate rate analysis shall be approved by the Territorial Superintending Engineer: F High Tensile Steel Rs. DSR Pune pwd civil work rates Documents. No cumulative increase shall be done.

Pipes, cement blocks, steel, tar bitumen, roofing felt, floor asphalt, steel, mating, bamboos and Ballies of all size, ceiling board, rubber P.

Copy attached in Pg. The increase in rates as above should be on ground floor basic rates only. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D. Rate or prevailing stock issue rate, whichever is more. No cumulative 202-13 shall be done. Pwd Dsr Pune Documents.

DSR Pune – [PDF Document]

Agency will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges. Bd-F Deals with the rate of concrete for grid slab, this item should be used for grid slab only i. The increase in rates as above should be applicable only one at a time e. Issue rates of Schedule A materials for above notified area shall be increased by respective percentage.

In case the quantity is more than Cu.

Rate of heating and unloading is Rs. For floor dst floor height more than 4. For National Highway works rates of state D. Statement A-1 – Material Master.

Current Schedule Rates P.W.D. DSR/CSR Pune, Maharastra, India – जरुरी Site

C Tor Steel H. In case the quantity is more than Cu. For calculation of transportation charges rates tabulated in material master for following items are considered in the formula.

  GRABOUILLA PAROLES PDF

Bd-F Deals with the 2012-113 of concrete for grid slab, this item should be used for grid slab only i.

Current Schedule Rates P.W.D. DSR/CSR 16-17 Pune, Maharastra, India

The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip. For calculation of transportation charges rates tabulated in material master for following items are considered in the formula. Department vide letter No.

Rubble, Metal, Sand, Murum etc. The increase in rates as above should be applicable only one at a time e. D Structural Steel Rs. Directorate of Insurance Maharashtra State vide letter No.

B Mild Steel Rs. Actual lead charges are to pne added for these supply items. However in case the rates are revised by Revenue and Forest Department time to time, the difference may be considered while preparing Estimate.

Rubble, Metal, Sand, Murum etc. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D. Published on Nov View 1. Copy of Notification attached. The same should be added in the rate analysis while framing the estimate and the amount shall be dsd from contractors bills as prescribed in the said G.